Timmins Gold Corp. (TSXV: TMM) is strategically positioned for continuous growth as a gold production and development company. Focused solely in Mexico, Timmins Gold has now is now ramping up to full production at it wholly owned San Francisco Gold Mine in Sonora Mexico at a rate of 80,000 to 100,000 ounces per year. Timmins Gold’s objective is to utilize future cash flow to expand existing reserves at the San Francisco Mine, explore its other properties and to grow the Company through strategic acquisitions. The combination of production and advanced explo- ration positions Timmins Gold for future growth and increased shareholder value.
The San Francisco Gold Mine is a past producing open pit heap leach operation with a probable mineral reserve of 611,000 ounces of gold. Timmins Gold will be producing gold at a rate of 80,000 - 100,000 ounces per year at a cash cost of $412 per ounce. All plant and equipment necessary for production is operational includ- ing crushing, leaching and extraction facilities. With permitting and construction com- plete, Timmins Gold is anticipating the first commercial gold pour by January 2010.

Timmins Gold portfolio consists of four promising gold properties currently under development and or exploration.
TIM Claims — Zacatecas
45,000 hectare land package contiguous to Goldcorp’s Penasquito gold deposit (17m oz) and near Canplats Camino Rojo gold deposit (3.5m oz).
Tequila Project — Jalisco
High grade system hosted within miner- alized breccias. First phase 3,827 meters drilling returned 14/18 economic gold grades.
2008 Drill Program Highlights:
BD-1: 24.3m of 5.88 g/t Au; 29.9 g/t Ag
BD-2: 13m of 2.36 g/t Au
BD-6: 1.5m of 5.6 g/t Au
BD-7: 23.35m of 1.82 g/t Au
BD-9: 4m of 4.43 g/t Au
Picacho — Sonora
SW of San Francisco Mine along Mojava Sonora Megashear. High grade minerali- zation encountered at surface
Cocula Property — Jalisco
Gold / silver mineralization contained in parallel quartz veins within a breccia. First phase 1,974 meter drilling con- firmed the existence of potential open pit minable deposit near surface.
2008 Drill Program Highlights:
RC-01: 37.5m of 1.30 g/t Au; 13 g/t Ag
RC-09: 54m of 0.72 g/t Au; 10 g/t A
RC-10: 37.5m of 1.20 g/t Au; 13 g/t Ag
El Capomo Property — Nayarit
High grade gold & silver samples on this grass roots project, located in the prolific mining district—Cebadillas and El Barqueno mines
Trincheras and Patricia — Sonora
Two claims staked to west of San Fran- cisco to secure mineralized occurrences of old mines
520 – 609 Granville Street Vancouver, BC, V7Y 1G5, Canada
| Telephone: | 604.682.4002 |
| Facsimile: | 604.682.4003 |
| Email: | info[at]timminsgold.com |
| Website: | http://www.timminsgold.com |